Delano
Regional Medical Center |
|

Currently in process
design for a new Operating Room Staff Lounge and a remodel of a
central service sterile area. Relocation of a new GI Laboratory is
in the Schematic Design stage.
|
|
|
Healdsburg
District Hospital |
|
The
project consists of two parts, remodel and addition. Due to the
abandoned low height over the driveway, portion of the canopy over
the driveway will be removed. The remainder of the canopy next to
the hospital building will be saved. A new wall enclosure will be
built under the canopy to capture the space (900 square-feet) for a
waiting area for the new ER. The new ER addition (3,412
square-feet) will provide a total of two exam rooms, six treatment
rooms and the required support spaces.
|
|
|
|
Mayers
Memorial Hospital |
Proposed
work includes the field verification of existing emergency
egress lights, communication system and fire alarm system. Based
on the results of the field survey, Aspen Street Architects,
Inc. will assemble an OSHPD submittal package per Subcommittee
for Senate Bill 1953 |
|
|
|
Surprise
Valley HCD |
|
Replacement
or the existing emergency generator with a new emergency generator.
Currently the construction documents have been submitted to OSPHD
and the plans are in the submittal process.
has
completed the final working drawings and final technical
specifications for the Emergency Generator Replacement
|
|
|
|
|
|
|
|
|
 |
Copyright 2006 © Aspen Street Architects All Rights Reserved
|